Scheduled Infrastructure Maintenance from 2026-07-07 08:00 UTC to 2026-07-07 15:00 UTC

Scheduled maintenance CBE Production (UAE, Middle East, Azure)
2026-07-07 08:00 UTC · 7 hours

Updates

Scheduled

As part of our routine lifecycle management, we are planning an infrastructure software upgrade for your Production environment. This upgrade is designed to enhance environment stability, performance, and security.
Here are the key details of the planned maintenance:
Environment: Production
Task: Infrastructure Software Upgrades
Duration: 7 hours
Expected Impact: No downtime expected. The environment will remain accessible.
Risk Level: Low. This upgrade has been successfully validated in our Dev/Staging and you Sandbox environments with full code compatibility.
Rollback Plan: In the unlikely event of an issue, a restoration from an immediate pre-upgrade backup is available.

June 21, 2026 · 09:25 UTC

← Back